The site was compacted and patchy after construction. We ripped and levelled the soil, added a light layer of topsoil, then sprayed a warm-season blend. Germination came through in 8 days and the first mow was at six weeks.
"Couldn't believe how quickly it filled in – and for a fraction of the turf quote."